• SCTE 103 2018

SCTE 103 2018

  • Test Method for DC Contact Resistance, Drop cable to "F"-Connectors and F81 Barrels
  • standard by Society of Cable Telecommunication Engineers, 2018
  • Category: SCTE

$50.00 $25.00

This document is identical to SCTE 103 2012 except for informative components which may have been updated such as the title page, NOTICE text, headers and footers. No normative changes have been made to this document.
The purpose of this test procedure is to measure the contact resistance or intimacy of contact between an F connector and the drop cable shield (outer conductor contact resistance) or the cable center conductor and the F81 barrel (inner conductor contact resistance.) This method is used to evaluate the tendency for unwanted high-resistance contacts. Depending on the application, high resistance contacts may cause excessive energy losses, overheating and possibly, in Cable Telecommunications systems, common path distortions. In any case however, it is most desirable to have contact resistance as close to zero as possible.
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

SCTE 164 2009

SCTE 164 2009

Emergency Alert Metadata Descriptor..

$25.00 $50.00

SCTE 24-3 2009

SCTE 24-3 2009

IPCablecom 1.0 Part 3: Network Call Signaling Protocol for the Delivery of Time-Critical Services ov..

$25.00 $50.00

SCTE 84-1 2009

SCTE 84-1 2009

HMS Common Inside Plant: Management Information Base (MIB) Part 1: SCTE-HMS-HE-COMMON-MIB..

$25.00 $50.00

SCTE 84-3 2009

SCTE 84-3 2009

HMS Inside Plant Management Information Base SCTE-HMS-HE-FAN-MIB..

$25.00 $50.00