• SCTE 103 2004

SCTE 103 2004

  • Test Method for DC Contact Resistance, Drop cable to F-Connectors and F81 Barrels, (formerly IPS TP 405)
  • standard by Society of Cable Telecommunication Engineers, 01/01/
  • Category: SCTE

$50.00 $25.00

The purpose of this test procedure is to measure the contact resistance or intimacyof contact between an F connector and the drop cable shield (outer conductorcontact resistance) or the cable center conductor and the F81 barrel (innerconductor contact resistance.). This method is used to evaluate the tendency forunwanted high-resistance contacts. Depending on the application, high resistancecontacts may cause excessive energy losses, overheating and possibly, in CableTelecommunications systems, common path distortions. In any case however, itis most desirable to have contact resistance as close to zero as possible.
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

SCTE 29 2012

SCTE 29 2012

Torque Requirements for Bond Wire Penetration of Bonding Set Screw..

$25.00 $50.00

SCTE 83-1 2012

SCTE 83-1 2012

HMS Inside Plant Management Information Base (MIB) Part 1: SCTE-HMS-HE-OPTICS-MIB..

$25.00 $50.00

SCTE 82 2012

SCTE 82 2012

Test Method for Low Frequency and Spurious Disturbances..

$25.00 $50.00

SCTE 132 2012

SCTE 132 2012

Test Method For Reverse Path (Upstream) Bit Error Rate..

$25.00 $50.00