• SAE ARP6257

SAE ARP6257

  • Aircraft Ground De/Anti-Icing Communication Phraseology for Flight and Ground Crews
  • standard by SAE International, 10/25/2016
  • Category: SAE

$81.00 $41.00

This document establishes standard phraseology for the communication procedures during aircraft ground deicing operations.

NOTE: The minimum requirements to accomplish an aircraft deicing operation are specified in the AS6285 document.

Clear concise standard phraseology between ground personnel and flight crews is an important part of the de/anti-icing process. It plays a key role in the overall safety of the deicing program. Historically, flight and ground crews have had to deal with differing communication scripts at multiple airport locations. This has led to unsafe situations, including aircraft moving before the deicing process has been fully completed.

PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

SAE ARP4101/5A

SAE ARP4101/5A

Aircraft Circuit Breaker and Fuse Arrangement..

$41.00 $81.00

SAE AS22520/45A

SAE AS22520/45A

CRIMPING TOOLS, TYPE I, HAND, WIRE, TERMINATION FOR WIRE BARREL SIZE 10 POWER CONTACTS..

$41.00 $81.00

SAE AS5259/7A

SAE AS5259/7A

CRIMPING TOOL AND ACCESSORIES, DIES, WIRE SIZE 8 TO 0000 UN-INSULATED AND INSULATED CRIMP BARRELS..

$41.00 $81.00

SAE AS9115A

SAE AS9115A

Quality Management Systems - Requirements for Aviation, Space, and Defense Organizations - Deliverab..

$41.00 $81.00