• PIP CVS02100

PIP CVS02100

  • Site Preparation, Excavation, and Backfill Specification [Complete Revision]
  • standard by Process Industry Practices, 06/01/2019
  • Category: PIP

$100.00 $50.00

This Practice describes the requirements for excavation, placement, inspection, and management of materials during the site preparation, excavation, and backfill phase of a construction project.
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

PIP PCCWE001

PIP PCCWE001

Weigh Systems Design Criteria [Complete Revision]..

$50.00 $100.00

PIP PCEWE001

PIP PCEWE001

Weigh Systems Guidelines [Complete Revision]..

$50.00 $100.00

PIP ARC01016

PIP ARC01016

Building Data Sheet [Complete Revision]..

$25.00 $50.00

PIP PNCM0004

PIP PNCM0004

Valve Commodity Codes Designator System [Reaffirmation with Editorial Revision]..

$25.00 $50.00