• PEI RP1000-09

PEI RP1000-09

  • Recommended Practices for the Installation of Marina Fueling Systems (2009 Edition)
  • Recommended Practice by Petroleum Equipment Institute, 2009
  • Category: PEI

$195.00 $98.00

The purpose of the document is to provide a basic reference that convey concrete, authoritative guidance on how to deal with the challenges of constructing safe, environmentally protective marina-fueling facilities that will allow reliable and economical service for many years.
These recommended practices apply to facilities that:
  • serve recreational, commercial, government facilities by storing and dispensing motor fuel into vessels,
  • have fixed, onshore storage tanks using submersible or suction pumps to move the fuel,
  • are located in fresh water or salt water, lake or river environments, stable or fluctuating water-level conditions, and along stable or fluctuating shorelines,
  • have underground or aboveground storage tanks,
  • have a dispensing device that is stationary or mobile (e.g., a hydrant-type system with a mobile fueling card).
These recommended practices do NOT apply to the following:
  • facilities where the storage tanks are in, on, or over water (e.g., floating tanks, tanks located over water on piers or floating docks), facilities where the tank is mobile (e.g., on a truck).
  • facilities where the tank is mobile e.g., on a truck).
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

PEI RP500-11

PEI RP500-11

Recommended Practices for Inspection and Maintenance of Motor Fuel Dispensing Equipment (2011 Editio..

$98.00 $195.00

PEI RP1200-12

PEI RP1200-12

Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Second..

$98.00 $195.00

PEI RP600-12

PEI RP600-12

Recommended Practices for Overfill Prevention for Shop-Fabricated Aboveground Tanks (2012 Edition)..

$98.00 $195.00

PEI RP1300-13

PEI RP1300-13

Recommended Practices for the Design, Installation, Service, Repair and Maintenance of Aviation Fuel..

$98.00 $195.00