  • Fossil Fuel Power Plant Unit/Plant Demand Development - Drum Type
  • standard by The International Society of Automation, 12/22/2014
  • Category: ISA

$83.00 $42.00

The scope of this standard is to address the unit/plant demand development subsystem for boilers with steaming capacities of 200,000 lbs/hr (25 kg/s) or greater. This subsystem includes generation demand, boiler demand development, turbine demand development, throttle/header pressure control, and unit megawatt/steam flow control as applicable.
This standard will address two types of process applications:
  • a) a single boiler supplying a single turbine, typical of an electric utility power plant; and
  • b) a single boiler or multiple boilers supplying a common distribution header, typical of an industrial power plant.
Specifically excluded from consideration are:
  • a) dispatch control;
  • b) turbine/generator control (other than turbine demand);
  • c) feedwater controls
  • d) steam temperature controls (covered separately by ANSI/ISA-77.44.01, Fossil Fuel Power Plant - Steam Temperature Controls);
  • e) combustion controls (covered separately by ANSI/ISA-77.41.01, Fossil Fuel Power Plant Boiler Combustion Controls);
  • f) steam distribution control systems;
  • g) economic loading of boilers; and
  • h) fluidized bed boilers.
Purpose
The purpose of this document is to establish the minimum requirements for the functional design specifications of unit/plant demand development for control systems for fossil-fueled power plant boilers.
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.