• IEEE C37.26-1972

IEEE C37.26-1972

  • IEEE Standard Guide for Methods of Power-Factor Measurement for Low-Voltage Inductive Test Circuits
  • standard by IEEE, 06/21/1972
  • Category: IEEE

$105.00 $53.00

New IEEE Standard - Superseded.Methods used to measure the power factor in low-voltage test circuits are covered. Since the power factor measurement for high-capacity test circuits is particularly difficult, and different methods may yield different results, the methods that are least likely to yield errors are recommended for particular circuit conditions. The ratio method is recommended for fast clearing devices that may have total interruption times of 0.5 cycle or less. The DC decrement method is recommended for circuits with a 30% power factor or less when the device to be tested interrupts at a point in time more than 0.5 cycle from the initiation of the current. The phase relationship method, using current and voltage waves, is recommended for circuits having power factors over 30%.
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

ULC 378

ULC 378

Guide for the Investigation of Draft Equipment (ULC C378-1975)..

$56.00 $112.86

ULC S702.2-03

ULC S702.2-03

Mineral Fibre Thermal Insulation for Buildings, Part 2: Application Guidelines..

$88.00 $176.00

ULC 583 Draft

ULC 583 Draft

Guide for the Investigation of Electric Battery Powered Industrial Trucks (ULC ORD)..

$77.00 $154.00

ULC C407-1974

ULC C407-1974

Guide for the Investigation of High Pressure Gas Manifolds..

$67.00 $133.00