• IEEE 1035-1989

IEEE 1035-1989

  • IEEE Recommended Practice: Test Procedure for Utility-Interconnected Static Power Converters
  • standard by IEEE, 11/22/1989
  • Category: IEEE

$50.00 $25.00

New IEEE Standard - Inactive-Withdrawn.A test procedure that applies to single- and three-phase units rated from 1 kW to 500 kW and may also be applied in principle to larger units is given. The objective is the measurement of electrical parameters at the ac terminals of the power converter. The procedure may serve as a basis for factory or acceptance testing. It focuses on equipment that lends itself to mass production and is readily interconnected to an electric utility, rather than on equipment subject to site-specific design and testing. Test results may be used in evaluating or comparing different types of static power converters. Only equipment with the primary function of delivering electric energy to circuits interconnected with the electric utility is covered by this procedure.
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

ULC 610

ULC 610

Standard for Factory-Built Fireplaces (CAN/ULC S610)..

$73.00 $146.00

ULC 263.1

ULC 263.1

Sprinkler-Protected Windows Systems (ULC/ORD-C263.1-99 (R2018))..

$74.00 $148.98

ULC ORD-C142.5-1992

ULC ORD-C142.5-1992

Concrete Encased Steel Aboveground Tank Assemblies For Flammable and Combustible Liquids..

$84.00 $168.00

ULC S653-94

ULC S653-94

Standard for Aboveground Steel Contained Tank Assemblies for Flammable and Combustible Liquids..

$77.00 $153.00