• ANS 58.22-2014

ANS 58.22-2014

  • Requirements for Low Power and Shutdown Probabilistic Risk Assessment - ANS/ASME-58.22-2014 (Trial Use Standard)
  • standard by American Nuclear Society, 03/25/2015
  • Category: ANS

$440.00 $220.00

This standard establishes requirements for a Level 1 PRA of internal and external hazards for low power and shutdown modes. These modes include operating states ranging from those in which the plant is at full power levels substantially below nominal full power (low power) to operating states in which the plant is shutdown with the reactor subcritical and the primary system depressurized and cooled sufficiently to be placed on RHR cooling. Here the low power modes are included only to the extent that they are part of LPSD evolutions eventually leading to plant shutdown. This standard bases these requirements in large part on ASME/ANS RA-Sa-2009, which at present is restricted to requirements for plant operating states at or near full power.
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

ANS 3.8.7-1998

ANS 3.8.7-1998

Criteria for Planning, Development, Conduct, and Evaluation of Drills and Exercises for Emergency Pr..

$35.00 $70.00

ANS 3.5-1998

ANS 3.5-1998

Nuclear Power Plant Simulators for Use in Operator Training and Examination..

$61.00 $121.00

ANS 5.10-1998 (R2013)

ANS 5.10-1998 (R2013)

Airborne Release Fractions at Non-Reactor Nuclear Facilities..

$73.00 $145.00

ANS 8.1-1998 (R2007)

ANS 8.1-1998 (R2007)

Nuclear Criticality Safety in Operations with Fissionable Materials Outside Reactors..

$53.00 $105.00